I haven't forgotten about this blog. I've just been working far too much to have any time to think about it. 58 hour workweeks (plus 10 hours total travel time for the week!) will do that. Don't worry, i'm building up a good amount of material for later. In the meantime, i wanted to share a quick anecdote.
Thursday we were pouring (as we often do) concrete spread footers, but on this particular day we were running rather behind schedule. There was a long ditch which turned at one point and stepped down, terminating in a footing we had poured several days before. While the concrete was being poured, adjustments were still being made to the steps at the turn. As i watched the concrete slowly ooze down towards the carpenters, all i could think about was Pipe Dreams. It was pretty fantastic.
The end.
8.02.2008
No,
Subscribe to:
Posts (Atom)